Tera

Agent readout · Public content

Same public page, without the visual layout. Interactive controls are described, not submitted.

https://www.tera.gw/guides/glossaryRetrieved 2026-11-21T21:36:05.306Z. This is a page retrieval time, not an inventory verification date.
All guides

GPU rental and colocation glossary

The terms in a GPU rental offer and in a colocation offer, each in one or two sentences.

Rental terms

Bare metal
A whole physical server for one customer, with no virtualization layer between the software and the hardware.
Dedicated node
A server that is reserved for one customer for the contract term. No other customer uses it.
Node
One server with its GPUs, CPUs, memory, storage and network ports. The nodes that Tera rents have 8 GPUs each.
Cluster
A group of nodes that work together, usually with a fast connection between them.
GPU-hour
One GPU for one hour. The unit of the rental rate. A node of 8 GPUs uses 8 GPU-hours each hour.
Contract term
The period for which the nodes are reserved and paid for, counted in months.
Prepayment
The part of the contract total that is paid before the term starts, shown as a percentage.
Reserved capacity
Capacity that a customer commits to for a term. It is billed for all hours, used or not.
On-demand
Capacity that is started and stopped by the hour with no commitment, usually at a higher rate.
Indicative offer
A published price and term that shows what is possible. It is not a reservation. A written offer confirms it.
Written offer
The document that confirms configuration, availability, price and dates for one customer.
Ready for service (RFS)
The date on which the nodes are installed, tested and handed to the customer. The term usually starts on this date.
Service level agreement (SLA)
The part of a contract that states the service that the provider commits to, for example availability, and what the customer receives if the provider misses it.
Utilization
The share of paid GPU-hours that do useful work. Low utilization raises the true cost of each hour used.

Hardware and workloads

GPU
Graphics processing unit. A processor that does many calculations in parallel, used to train and to run AI models.
GPU memory
The memory on the GPU itself, also called VRAM. A model and its working data must fit in it.
Training
The work of making a model from data. It runs for hours to weeks and often uses many GPUs together.
Fine-tuning
Training that adapts an existing model to new data. It needs less compute than training from the start.
Inference
The work of running a trained model to answer requests.
Checkpoint
A saved copy of a model during training, so that a run can continue after a stop.
NVMe
A fast type of solid-state storage inside a server, used for datasets and checkpoints.

Networking

InfiniBand
A networking technology made for high-performance computing, with its own switches and adapters. It connects nodes with very low delay.
RoCE
RDMA over Converged Ethernet. It gives the low delay of RDMA on Ethernet equipment.
RDMA
Remote direct memory access. One server reads and writes the memory of another without the usual path through the operating system.
Bandwidth
The quantity of data that a connection carries in one second, for example 10 Gbps.
Cross-connect
A physical cable in a data center between the equipment of a customer and a carrier or another customer.
Egress
Data that leaves the provider toward the internet or another site. Some providers charge for it.

Data center and colocation

Colocation
A service in which a customer puts its own servers in the data center of another company, which supplies space, power, cooling and connectivity.
Rack
The standard frame that holds servers and switches in a data center.
Rack unit (U)
The unit of height in a rack: 1.75 inches. A full rack commonly has 42 U or more.
Rack density
The power that one rack draws, in kW. GPU racks have a much higher density than ordinary server racks.
Kilowatt (kW)
A unit of power: the rate at which equipment uses electricity. Colocation capacity is sold in kW.
Kilowatt-hour (kWh)
A unit of energy: one kilowatt for one hour. Electricity use is billed in kWh.
Megawatt (MW)
1,000 kW. The usual unit for the capacity of a data-center hall or site.
IT load
The power that the servers and the network equipment draw, without cooling and other facility systems.
PUE
Power usage effectiveness. The total power of a facility divided by its IT load. A lower figure means less power for cooling and other systems.
PDU
Power distribution unit. The equipment in a rack that brings power to each server.
Power feed
One electrical supply to a rack. Two separate feeds, A and B, let a server stay on when one fails.
N+1 and 2N
Two levels of redundancy. N+1 has one spare unit more than the load needs. 2N has a complete second system.
Air cooling
Cooling that moves cold air through the servers and removes the hot air.
Direct liquid cooling
Cooling that brings a liquid to cold plates on the GPUs and CPUs. Some new GPU servers need it.
Remote hands
Work on a customer's equipment by the staff of the data center, for example to replace a part or a cable.
Letter of intent (LOI)
A document in which two parties state that they intend to make an agreement. It usually does not bind them to the full terms.